Please see the News and Notices Page for all City updates.

  • Allen Park Playground - replacement of fencing

    Share Allen Park Playground - replacement of fencing on Facebook Share Allen Park Playground - replacement of fencing on Twitter Share Allen Park Playground - replacement of fencing on Linkedin Email Allen Park Playground - replacement of fencing link
    CLOSED: This project is complete.
    supporting image

    In mid-March 2021, the City plans to replace the existing dilapidated Allen Park playground fence and gates, with a new 1.2m high black PVC coated chain wire fence. The existing alignment of the fence will remain the same. Presently we have confirmation that this work will commence and be completed on the 19 March 2021.

    This work will be undertaken during daylight hours and there may be some inconvenience for users of the playground during this time. However, the City will ensure any inconvenience is limited while this work is being undertaken.

    If you have any queries in relation to this work, please contact our Administration Centre on 9273 3500 who can direct your queries to the Project Manager.

  • Claremont Train Station - Temporary bus layover on Railway Road

    Share Claremont Train Station - Temporary bus layover on Railway Road on Facebook Share Claremont Train Station - Temporary bus layover on Railway Road on Twitter Share Claremont Train Station - Temporary bus layover on Railway Road on Linkedin Email Claremont Train Station - Temporary bus layover on Railway Road link
    CLOSED: This discussion has concluded.
    supporting image

    From 8pm Monday 8 February to 5am Wednesday 10 February 2020, Public Transport Authority (PTA) have plans to create a temporary bus layover area on Railway Road while works are being carried out at the Claremont Station as part of the Forrestfield Airport Link Services.

    A number of other significant project works will take place during the closure between Showgrounds and Swanbourne stations. Work will take place 24 hours a day and a variety of machinery will be used.

    For full details of the work, visit the Metronet project page.

  • Nandina Ave: Camelia Ave to Zamia St - Footpath Upgrades

    Share Nandina Ave: Camelia Ave to Zamia St - Footpath Upgrades on Facebook Share Nandina Ave: Camelia Ave to Zamia St - Footpath Upgrades on Twitter Share Nandina Ave: Camelia Ave to Zamia St - Footpath Upgrades on Linkedin Email Nandina Ave: Camelia Ave to Zamia St - Footpath Upgrades link
    CLOSED: This project is complete.
    supporting image

    Axiis Contracting will be carrying out the above-mentioned works on behalf of the City of Nedlands.

    Footpath upgrade works along Nandina Avenue, Mt Claremont will commence on Monday 15 March 2021 and should be completed within a two-week timeframe, dependent on weather and resources.

    The works will include:

    • Demolition of the existing slab footpath;
    • Service adjustments;
    • Installation of a new concrete footpath; and
    • Driveway accommodation works.

    Works will be undertaken during weekdays, between the hours of 7:00am – 5:00pm. View the site location here.

    Please note that some preparatory works will need to be undertaken outside of these dates and may include survey and paint markings.

    Lane and footpath closures will be in place with detours around the work site. Local traffic will continue to have limited access whilst closures are in place, and on-site traffic controllers will be happy to assist. The operations team on site will endeavour to offer access to your property at all times, however there may be short periods when materials are required to cure, and on these occasions the City will ensure contact has been made and suitable alternative arrangements have been discussed.

    Should you have any further enquiries, please contact the Site Supervisor Jarrod Daniel on 0429 066 5023 or alternatively the City’s Representative, Jason Spyker on (08) 9273 3500.

  • Changes to Bruce Trust Land & Amendments to Scheme

    Share Changes to Bruce Trust Land & Amendments to Scheme on Facebook Share Changes to Bruce Trust Land & Amendments to Scheme on Twitter Share Changes to Bruce Trust Land & Amendments to Scheme on Linkedin Email Changes to Bruce Trust Land & Amendments to Scheme link
    CLOSED: This discussion has concluded.
    supporting image

    In response to public statutory consultation in April 2018 and the Ordinary Council meeting held 24 September 2019, Council resolved for the CEO to put forward a Scheme Proposal to the Office of the Attorney General to vary the Bruce Trust Indenture.

    The Scheme for variation of Trust under the Charitable Trusts Act 1962 (WA) was approved by the Hon Attorney General and the Scheme published in Government Gazette number 70 on 8 May 2020 at page 1168.
    Please see document library for your reference.

    The Scheme Variation corrects an anomaly between the Trust land and the existing road along The Esplanade by recognising the road, allowing vehicles to park on the edge of the road and allows for the application of the City of Nedlands Parking and Parking Facilities Local Law 2013 on the road that is situated on part of the Bruce Trust Land. The Scheme Variation does not allow the road to be widened.

  • Lissadell Street - Road Surface Upgrades and Associated Works

    Share Lissadell Street - Road Surface Upgrades and Associated Works on Facebook Share Lissadell Street - Road Surface Upgrades and Associated Works on Twitter Share Lissadell Street - Road Surface Upgrades and Associated Works on Linkedin Email Lissadell Street - Road Surface Upgrades and Associated Works link
    CLOSED: These works have been completed.
    supporting image

    The City is undertaking road surface upgrades and associated works on Lissadell Street between Kirwan Steret & Alderbury Street, Floreat.

    Roads 2000 will carry out the works, commencing Monday 30 November 2020 between the hours of 7:00am – 5:00pm.

    The works should be completed within a three-week timeframe, dependent on weather/resources and will include:

      • Kerb removal & earthworks
      • Road profiling
      • New asphalt base course
      • New kerb and crossover installation
      • Backfilling works
      • New asphalt wearing course

    Please note that some preparatory works will need to be undertaken outside of these dates and may include survey and paint markings.

    Road closures will be in place with detours around the work site. Local traffic will continue to have limited access whilst closures are in place, and on-site traffic controllers will be happy to assist. View the site location via the Document Library.

    Should you have any further enquiries, please contact the Project Coordinator, Nyein Chan Soe on 0437 932 746 or alternatively the City's Representative, Myles Bovell on (08) 9273 3500.

  • Karella Street - Road Surface upgrades and associated works

    Share Karella Street - Road Surface upgrades and associated works on Facebook Share Karella Street - Road Surface upgrades and associated works on Twitter Share Karella Street - Road Surface upgrades and associated works on Linkedin Email Karella Street - Road Surface upgrades and associated works link
    CLOSED: These works have been completed.
    supporting image

    The City is undertaking road surface upgrades and associated works on Karella Street between Williams Road & Hampden Road, Nedlands.

    Roads 2000 will carry out the works, commencing Monday 23 November 2020 between the hours of 7:00am – 5:00pm.

    The works should be completed within a four-week timeframe, dependent on weather/resources and will include:

    • Kerb removal & earthworks
    • Road profiling
    • New asphalt base course
    • New kerb and crossover installation
    • Backfilling works
    • New asphalt wearing course

    Please note that some preparatory works will need to be undertaken outside of these dates and may include survey and paint markings.

    Road closures will be in place with detours around the work site. Local traffic will continue to have limited access whilst closures are in place, and on-site traffic controllers will be happy to assist. View the site location via the Document Library.

    Should you have any further enquiries, please contact the Project Coordinator, Nyein Chan Soe on 0437 932 746 or alternatively the City's Representative, Myles Bovell on (08) 9273 3500.

  • Cnr Stirling Hwy and Smyth Road - Road repairs

    Share Cnr Stirling Hwy and Smyth Road - Road repairs on Facebook Share Cnr Stirling Hwy and Smyth Road - Road repairs on Twitter Share Cnr Stirling Hwy and Smyth Road - Road repairs on Linkedin Email Cnr Stirling Hwy and Smyth Road - Road repairs link
    CLOSED: These works have been completed.
    supporting image

    Notice on behalf of Water Corporation

    The bitumen road will be repaired on the corner of Stirling Highway and Smyth Road following previous maintenance and faults that have occurred.

    Works will take place between 7pm to 5am 19 & 20 November 2020.

    During this time, you may experience noise, additional work vehicles, mobile plant, flashing lights and traffic management. Every effort will be made to keep disruptions to a minimum.

    If you have any other questions about the work, please call our 24-hour faults line, 13 13 75.



  • Western Power Work - Adderley Street

    Share Western Power Work - Adderley Street on Facebook Share Western Power Work - Adderley Street on Twitter Share Western Power Work - Adderley Street on Linkedin Email Western Power Work - Adderley Street link
    CLOSED: These works are now complete.
    supporting image

    Notice on behalf of Western Power.

    Western Power will be carrying out work in Mt Claremont. To ensure the safety of crew and the community, they will need to turn off power while completing this work.

    Properties affected: Adderley St Mount Claremont 6010
    Start time: Thursday, 12 November 2020 at 08:30 PM
    End time: Friday, 13 November 2020 at 05:30 AM

    Western Power always aim to minimise any disruption, however sometimes it can take up to two hours to switch the power off safely. Unforeseen issues can also impact when the power is restored.

    Should you have any queries, please contact Western Power on 13 10 87.

  • Annual Bushland Spraying Program 2020

    Share Annual Bushland Spraying Program 2020 on Facebook Share Annual Bushland Spraying Program 2020 on Twitter Share Annual Bushland Spraying Program 2020 on Linkedin Email Annual Bushland Spraying Program 2020 link
    The annual bushland weed spraying program is now complete. The City commenced the annual bushland reserves environmental weed control program on the 9th July with contractors completing the grass control in August and the bulbous weed control by mid-September.
    supporting image

    The annual spraying program is being undertaken by Contractors from July through to October 2020 to control environmental weeds in the following bushland areas:

    • Shenton Bushland
    • Allen Park
    • Hollywood Reserve
    • Birdwood Parade Bushland
    • Point Resolution Bushland
    • Mt Claremont Oval Bushland
    • Mt Claremont Community Centre
    • Swanbourne Estate


    The City will be focusing on the control of bulbous weeds, and annual and perennial grass weeds using the herbicides listed below:

    • Metsulfuron-methyl: used to control bulbous weeds
    • 2 2-DPA (Dalapon): used to control bulbous weeds
    • Glyphosate: used in conjunction with metsulfuron-methyl to control bulbous weeds
    • Fusilade: used to control annual and perennial grass weeds.

    Signage will be displayed whilst these works are occurring.

    The City undertakes environmental weed control to improve biodiversity values and to reduce the negative impacts environmental weeds cause to the ecosystems they invade, for example they compete with native plants, thereby reducing the species and diversity for both flora and fauna.

    Environmental weeds cause erosion, alter water availability, change soil nutrients, increase the likelihood of bush fires and change vegetation communities within bushland areas.

    For further information, please contact Vicki Shannon, the City's Environmental Conservation Coordinator on (08) 9273 3500, or email vshannon@nedlands.wa.gov.au

  • Swanbourne Oval Greenway Development - Stage 1

    Share Swanbourne Oval Greenway Development - Stage 1 on Facebook Share Swanbourne Oval Greenway Development - Stage 1 on Twitter Share Swanbourne Oval Greenway Development - Stage 1 on Linkedin Email Swanbourne Oval Greenway Development - Stage 1 link
    CLOSED: This has been updated. Please see above.
    supporting image

    The City in conjunction with the Swanbourne Coastal Alliance and the Friends of Allen Park received a grant from the Western Australian Planning Commission through the Coastwest Grants Program 2019/20 to undertake Swanbourne Oval Greenway Development – Stage 1.

    This project is being undertaken in accordance with the Allen Park Masterplan and Swanbourne Oval refurbishment works. The project will covert the northern part of Swanbourne Beach Oval to coastal bushland (approximately 2.4 Ha) as well as undertake ongoing restoration of adjacent coastal areas within Allen Park. It will involve site preparation in April/May, followed by installation of certified mulch in May and revegetation with 5500 low growing locally occurring native shrubs and ground covers in June and July.

    The project will assist with the City’s aims of protecting biodiversity, providing improved habitats, connectivity for local fauna and increasing the City’s capacity to absorb greenhouse gas emissions.

    Objectives

    • Increase the integrity of the coastal corridor by developing and enhancing ecological linkages to adjacent coastal areas north and south in Cottesloe and Cambridge;
    • Enhance the existing greenway corridor at Allen Park by increasing the area of bushland in the Reserve;
    • Removal of invasive weeds;
    • Revegetation with local provenance native seedlings;
    • Maintenance of public access such as beach fencing;
    • Improvement of bushland condition;
    • Reducing erosion;
    • Increasing habitat of fauna such as the resident White-winged and Chestnut Fairy-wrens
    • Strengthening two regional greenways - the coastal greenway and the Bold Park to Kings Park Greenway
    • Protection of environmental values and biodiversity within the coastal zone;
    • Increasing the atheistic quality of the area; and
    • Building capacity by involving the community.


    Timeline

    ACTIVITY

    TIMEFRAME

    Site Preparation

    April – May 2020

    Mulching

    May 2020

    Planting

    June/July 2020

    Weed Control

    Ongoing