Please see the News and Notices Page for all City updates.
Category Community Infrastructure Show all
-
Rosedale Street - Road Rehabilitation
Share Rosedale Street - Road Rehabilitation on Facebook Share Rosedale Street - Road Rehabilitation on Twitter Share Rosedale Street - Road Rehabilitation on Linkedin Email Rosedale Street - Road Rehabilitation linkCLOSED: This project has concluded.Commencing 4 November 2019, Civcon will be carrying out the following works in addition to road re-surfacing on Rosedale Street, Floreat:
- Profiling of existing road
- New kerb
- Driveway accommodation works
- New asphalt surface
- New line-marking.
The works should be completed within a three-week timeframe, dependent on the weather and resources, and will be undertaken during weekdays, between the hours of 7:00am – 5:00pm. Please note that some preparatory works will need to be undertaken outside of these dates and may include kerb removal and paint markings.
A pdf of the site location can be found in the document library.
Road closures will be in place with detours around the work site. Local traffic will continue to have access whilst closures are in place, and on-site traffic controllers will be happy to assist.
Please ensure that you test your reticulation system and report any faults to the City within 2 weeks of the works being completed. After this period the City cannot be held responsible for repairs.
Should you have any further enquiries, please contact the Site Supervisor, Chris Bredice on 0477 169 409 or the City's representative, Myles Bovell on (08) 9273 3500. Further updates on this project will be posted to this page.
-
Ringneck Lane - Drainage and Pavement Upgrade
Share Ringneck Lane - Drainage and Pavement Upgrade on Facebook Share Ringneck Lane - Drainage and Pavement Upgrade on Twitter Share Ringneck Lane - Drainage and Pavement Upgrade on Linkedin Email Ringneck Lane - Drainage and Pavement Upgrade linkCLOSED: This construction has concluded.Commencing 18 November 2019, Civcon will be carrying out new drainage and brick paving along Ringneck Lane (east of Hobbs Avenue, Dalkeith.
View the site location here. Lane closures will be in place with detours around the work site. Local traffic will continue to have limited access whilst closures are in place, and on-site traffic controllers will be happy to assist.The works should be completed within a three-week timeframe, dependent on the weather and resources. Works will be undertaken during weekdays, between the hours of 7:00am - 5:00pm.Please note that some preparatory works will need to be undertaken outside of these dates and may include survey and paint markings.Further enquiries, please contact the Site Supervisor Chris Bredice on 0477 169 409 or alternatively the City's Representative, Myles Bovell on (08) 9273 3500.
Further updates will be posted to this page. -
College Park Pump Track Complete
Share College Park Pump Track Complete on Facebook Share College Park Pump Track Complete on Twitter Share College Park Pump Track Complete on Linkedin Email College Park Pump Track Complete linkCLOSED: This project has concluded.The City has completed its refurbishment and sealing of the College Park Pump Track.
The fencing will be removed on Friday 18 October 2019, once the sealing is fully hardened.Thank you for your patience during this time.
-
Montario Quarter recognised as a world leader in sustainability
Share Montario Quarter recognised as a world leader in sustainability on Facebook Share Montario Quarter recognised as a world leader in sustainability on Twitter Share Montario Quarter recognised as a world leader in sustainability on Linkedin Email Montario Quarter recognised as a world leader in sustainability linkCLOSED: This discussion has concluded.The City has worked closely with Land Corp in developing Montario Quarter and the northern and central parklands are now open!
Montario Quarter is the perfect place for entertaining, fitness, relaxing, art and fun, and high quality, carefully designed parks and public open spaces will be a key feature as this precinct develops.
The Green Building Council Australia (GBCA) has recognised Montario Quarter as being among the world's leading sustainable developments, through accreditation as a 6-Star Green Star Community.
Receiving GBCA's highest precinct sustainability rating, Montario Quarter was acknowledged for key sustainability elements including:
- More than 25% of the site retained as public open space
- Water-wise landscaping and re-vegetation of the retained bushland using local native species
- Early community engagement to identify local values for the retention of key heritage/environmental features
- Improved building energy and water use performance through sustainable building Design Guidelines
- Encouraging access to local-sourced fresh food, with requirements on developers to install a community garden as part of the development
To view Land Corp's Community, Environment, Heritage and Housing Fact Sheets, visit the document library or visit Land Corp's website for more information on the development.
-
College Park Pump Track
Share College Park Pump Track on Facebook Share College Park Pump Track on Twitter Share College Park Pump Track on Linkedin Email College Park Pump Track linkCLOSED: This project has concluded.Please be advised that works are due to commence on the refurbishment and sealing of the College Park Pump Track on Tuesday 1 October. To facilitate this, the area will be drained and the blocked drains cleared on Thursday 26 September.
Temporary fencing will be going up on Tuesday 1 October and works are expected to be complete by Tuesday 15 October.
The City recognises the timing may be unfortunate with school holidays, however we believe the long term benefits will far outweigh any inconvenience.
-
Rochdale Road - Bollard Installation
Share Rochdale Road - Bollard Installation on Facebook Share Rochdale Road - Bollard Installation on Twitter Share Rochdale Road - Bollard Installation on Linkedin Email Rochdale Road - Bollard Installation linkCLOSED: This project has concluded.The City has appointed contractors Protek 24/7 to undertake the replacement of existing bollards on Rochdale Road, between Alfred Road and Haldane Street. The works will commence on Monday 23 September, 2019 and will be undertaken during weekdays, between the hours of 9:00am - 2:45pm.
Traffic management will be in place around the work site to ensure the smooth flow of traffic. The works should be completed within a two-day timeframe; however this is dependent on the weather and resources.
For further enquiries, please contact the City's representative Jason Spyker on (08) 9273 3500. -
Swanbourne Beach Oval - Rehabilitation Works
Share Swanbourne Beach Oval - Rehabilitation Works on Facebook Share Swanbourne Beach Oval - Rehabilitation Works on Twitter Share Swanbourne Beach Oval - Rehabilitation Works on Linkedin Email Swanbourne Beach Oval - Rehabilitation Works linkCLOSED: This discussion has concluded.Swanbourne Beach Oval will be closing from Monday, 11 March 2019, for a period of up to four months to undertake improvements to the oval's surface and surrounds.
Works will be undertaken weekdays, between the hours of 7am and 5pm.
The site will be secured with temporary fencing to ensure a safe work site and area for people moving around the site. There will be some minor and temporary inconvenience at times to footpaths and local traffic in and around the site during the works. In addition, due to the nature of the works, trucks will be accessing the site at various intervals with materials. The access route will be from the West Coast Highway/North Street/Marine Parade.The rehabilitation works will include:
- Levelling the oval surface with a compactor
- Installing a new irrigation system
- Constructing a new cricket wicket
- Establishing new turf
- Installing new park furniture
- Reverting areas of existing turf to eco-zones (bush revegetation)
These works are being carried out in accordance with the approved Allen Park Master Plan endorsed by Council at its meeting on 19 December 2017.For queries, please contact the City's Project Supervisor, Mr Craig New on 9273 3500 or at council@nedlands.wa.gov.au. Further updates in relation to this project will be posted on this page.
-
Intersection of Robinson Street & Stirling Highway - Carpark Upgrades
Share Intersection of Robinson Street & Stirling Highway - Carpark Upgrades on Facebook Share Intersection of Robinson Street & Stirling Highway - Carpark Upgrades on Twitter Share Intersection of Robinson Street & Stirling Highway - Carpark Upgrades on Linkedin Email Intersection of Robinson Street & Stirling Highway - Carpark Upgrades linkCLOSED: This discussion has concluded.The City has appointed Contractors, Civicon to undertaken car park upgrades at the intersection of Robinson Street and Stirling Highway.
Road work will start on Thursday 9 May, 2019 and is expected to be completed within a two days and will be undertaken between Monday to Friday, between the hours of 7am - 5pm.
For day-to-day operational enquiries, please contact the Contractors, Site Supervisor Chris Bredice on 0477 169 409. For other enquiries please contact the City's Project Manager, Jason Spyker on 9273 3545.
Updates on this project will be posted to this page.
-
Leura Street - Road Surface Upgrades and Associated Works
Share Leura Street - Road Surface Upgrades and Associated Works on Facebook Share Leura Street - Road Surface Upgrades and Associated Works on Twitter Share Leura Street - Road Surface Upgrades and Associated Works on Linkedin Email Leura Street - Road Surface Upgrades and Associated Works linkCLOSED: This discussion has concluded.The City has appointed Contractors, Roads 2000 to undertake road surface upgrades and associated works. These works will include:
- Kerb removal, earthworks and drainage
- Road profiling
- New asphalt base course
- New kerb and footpath installation
- Backfilling
- New asphalt wearing course
The works will commence on Leura Street on the 6 May 2019 for a period of six weeks between the hours of 7am and 5pm.
Some preparatory works will need to be undertaken outside of these dates and may include kerb removal, and paint markings.
Road closures will be in place with detours around the work site. Local traffic will continue to have access and on-site traffic controllers will be happy to assist.
For day-to-day operational enquiries, please contact the Contractors Project Manager, James Beier on 0403 546 211. For other enquiries please contact the City's Project Manager, Myles Bovell on 9273 3500.
Further information or updates will be posted to this page.
-
Dalkeith and Princess Road - Roundabout maintenance works
Share Dalkeith and Princess Road - Roundabout maintenance works on Facebook Share Dalkeith and Princess Road - Roundabout maintenance works on Twitter Share Dalkeith and Princess Road - Roundabout maintenance works on Linkedin Email Dalkeith and Princess Road - Roundabout maintenance works linkCLOSED: This work has been completedRoads 2000 will be carrying out maintenance works on the roundabout at the Dalkeith and Princess Road intersection commencing on Monday 15 April 2019. The works will be undertaken during weekdays, between 7am to 5pm and should be completed within one week.
The works will include:
- Kerb Removal
- Ground Preparation
- Reinstatement of new concrete kerbing
- Reinstatement of new concrete roundabout infill
Some preparatory works will need be to undertaken outside of these dates and may include service location, surveying and paint marking.
Road closures will be in place with detours around the work site. Local traffic and pedestrians will continue to have access with on-site traffic controllers providing assistance.
Please visit the document library to view a map of where the works will take place.
For operational queries, please contact the Contractor's Project Manager, James Beier on 0403 546 211 For all other enquiries, please contact the City's Project Manager, Tim Hollow on 9273 3500.
Further updates will be posted on this page as the project progresses.
Thank you for your patience while this work is being undertaken.