About the Development Application

    What is a Development Application (DA)?

     

    Development Application (DA) is an application made to Council seeking consent to carry out development including construction, demolition, change of use, display of advertising, subdivision, or making alterations or additions to a property or premises. A DA is required so that Council can assess the likely impacts of the proposal.

    Who is the applicant?

     

    The applicant for this project is Planning Solutions.

    Where is this development located?

     

    The development comprises of 1 lot, being Lot 541 (No. 99) Broadway, Nedlands.

    Why has the City allowed this application to be proposed?

     

    The City cannot refuse to accept an application for assessment. The City must follow the correct assessment process and will access the application according to the planning process, make a recommendation with the final decision made by the Metro Inner North Joint Development Assessment Panel. 

    What is the City’s view of this application – will it be supported?

     

    The City follows a process for each Development Application received. The application must be assessed according to the provisions of the Town Planning Scheme, advice will be sought on design quality  and the consultation submissions will be considered prior to the City forming a view on this application.  A recommendation is then presented to to the  Metro Inner North Joint Development Assessment Panel (DAP), who is the final decision maker. The Council have the opportunity to consider the recommendation made to the DAP, but not alter it.

    How can I make a submission or be heard by the Council or the Development Assessment Panel (DAP) on this matter?

     

    Submissions can be made on the ‘Your Voice' online submission form. Should you make a submission on the application, you will be notified of the relevant Development Assessment Panel (DAP) meeting and how to apply to make a deputation at the meeting.

    What is proposed?

    The proposal seeks approval for a six storey Mixed use development comprising 21 Multiple dwellings and a ground floor Café.


    How long would any approval be valid for?

     

    Normally, a planning approval is valid for 2 years, unless a different period of time of explicitly set. Currently, all planning approvals are valid for 4 years as a response to the current COVID-19 pandemic. This longer period of time will remain until the current State of Emergency is cancelled.

Planning

    Are there any other provisions that apply to this site?

     

    The City’s Local Planning Policy - Interim Broadway Built Form Design Guidelines.

Building Height

    What shadow will the proposed building create?

    According to the applicant's report, the proposal will overshadow 101 Broadway by 77.1%, 1 Elizabeth Street by 18.9%, 1A Elizabeth Street by 30.2%, and 1B Elizabeth Street by 6.6%.


    How many storeys is the proposed developement?

     

    The proposed development will comprise a single six (6) storey building.  

Traffic

    What about the extra traffic that will be generated by this proposed development?

     

    The application includes a Traffic Impact Statement. The report considers the projected traffic generated from the proposed development and assesses how this fits into the surrounding road network. This report also considers existing and proposed pedestrian and cyclist facilities as well as public transportation availability.  This report is currently being reviewed by the City. 

    How many parking bays are proposed?

    A total of 33 car parking bays are proposed which include on (1) ACROD bays.

Amenity and Infrastructure

    Will any consideration be given to residential amenity?

     

    The application will be assessed against all elements of the Residential Design Codes Volume 2 – Apartments and the ten principles of good design contained in State Planning Policy 7.0 – Design of the Built Environment. These documents place considerable weight on amenity impacts, as does the City’s Local Planning Scheme No.3.

    Can the sewerage mains in the area support all the extra residents?

     

    Sewerage and water capacity is controlled by Water Corporation. The Corporation manages impacts of new development on its infrastructure in a number of ways. This includes being a party to the state infrastructure committee, which identifies areas where increased development will take place. This allows for new development to be planned for with any new infrastructure required identified and contributed to by the developer or developers that trigger the upgrade. Water Corporation are also required to make comment on developments of this type. 

Zoning and Land Use

    1. City receives Development Application (DA)

    • The applicant submits a Development Application (DA) to the City of Nedlands
    • DA is recorded and an initial assessment is made by a City planning officer
    • City officer forwards information to the Development Assessment Panel (DAP) at the WA Department for Planning for lodgement
    • The City then has 90 days to complete a full submission called a Responsible Authority Report (RAR) to present to the DAP

    2. Consultation and referrals

    • CONSULTATION: The DA is advertised according to the City's Consultaton of Planning Proposal Local Planning Policy received by the City are collated, summarised and considered by the City planing officer according to the criteria and planning guidelines/schemes
    • REFERRALS: The DA is referered to internal relevant departments within the City for review and comment
    • The DA is referred to Main Roads Western Australia (MRWA) for comment, as the proposal abuts Stirling Highway (identified as a Primary Regional Road). Further information or amendments may be requested of the applicant as part of the referrals process.

    3. Assessment

    • The City's planning officer conducts an assesment of the proposal against any relevant development controls and legislation applicable to the DA
    • Further information and/or amended plans may be requested of the applicant following assessment

    4. Responsible Authority Report (RAR)

    Planning Officer prepares Responsible Authority Report (RAR), and RAR is submitted to Development Assessment Panel (DAP) for determination.

    Note:  If applicable, the RAR may be presented to a Council Meeting or Special Council Meeting if required for comment prior to being submitted JDAP.

    5. DAP Meeting and DA determination

    • Following the submission of the RAR, the Development Assessment Panel (DAP) secretariat will organise a meeting time and place for the determination and the applicant and any submitters are made aware as they are welcome to attend the meeting and provide deputations if desired
    • The DAP members (consisting of a Chairperson, two independent appropriate professionals - usually architects or planners and two representative City Elected Members) consider the proposal, responsible authority report and any deputations before providing their determination of the application
    • The decision is made for or against the application (with conditions and reasoning stated) by the DAP and the decision communicated to the City and the relevant applicant