2022 Riverbank Grant Foreshore Reserve 28307 Concept Design Plan Consultation

Share 2022 Riverbank Grant Foreshore Reserve 28307 Concept Design Plan Consultation on Facebook Share 2022 Riverbank Grant Foreshore Reserve 28307 Concept Design Plan Consultation on Twitter Share 2022 Riverbank Grant Foreshore Reserve 28307 Concept Design Plan Consultation on Linkedin Email 2022 Riverbank Grant Foreshore Reserve 28307 Concept Design Plan Consultation link

Consultation has concluded

Are you a local resident or do you use Foreshore Reserve 28307 in Dalkeith (located between Bishop Road Reserve and Point Resolution)? Would you like to provide your comments on the draft concept design plan to rehabilitate this area?

Draft Concept Plan

The City has received funding from the Department of Biodiversity Conservation and Attractions (DBCA) through its 2020-21 Riverbank grants program for the project “Foreshore Reserve 28307 Greenway Corridor Development Stage 1”. This project aims to develop a concept design plan and control environmental weeds.

Issues being considered in the draft concept plan:

  • Amenity – this area is currently unmanaged and has extensive environmental weed invasion. The project aims to improve the management and amenity of the area.
  • Climate change - continued climate change with increased temperatures, rising sea levels and increased risk of storms and floods will result in increased erosion of the Swan River foreshore and adjacent infrastructure.
  • Accessibility and community use – access is currently unmanaged in the area, the concept plan aims to formalise access for river foreshore users and adjacent residents.
  • Environmental Conservation – this project aims to reinstate and re-connect native fringing foreshore vegetation, expanding green areas and native habitat.
  • Protection of infrastructure – this project will reduce erosion and protect adjacent residential properties and infrastructure.

How can you get involved, find out more or provide feedback

  • View the draft concept design in the document library.
  • View the frequently asked questions (FAQ) in the document library.
  • Provide comments on the draft concept design plan by 5pm, Wednesday, 02 March 2022.
  • Should you have any queries, please contact a member of the Project Team (details on right-hand side of page under Who's Listening).
  • You are required to be a registered user of Your Voice in order to submit your comments. If you have not already done so, please register via the "Register to get Involved tab" on the right-hand side of this page. Registering will also enable the City to keep you updated on this and other City projects.

Further Updates will be posted to this page via the Updates below.

Please provide your comments on the draft concept design plan. Due to some technical difficulties with the YourVoice platform we have now extended the deadline for comments to 5pm, Wednesday, 02 March 2022.



Are you a local resident or do you use Foreshore Reserve 28307 in Dalkeith (located between Bishop Road Reserve and Point Resolution)? Would you like to provide your comments on the draft concept design plan to rehabilitate this area?

Draft Concept Plan

The City has received funding from the Department of Biodiversity Conservation and Attractions (DBCA) through its 2020-21 Riverbank grants program for the project “Foreshore Reserve 28307 Greenway Corridor Development Stage 1”. This project aims to develop a concept design plan and control environmental weeds.

Issues being considered in the draft concept plan:

  • Amenity – this area is currently unmanaged and has extensive environmental weed invasion. The project aims to improve the management and amenity of the area.
  • Climate change - continued climate change with increased temperatures, rising sea levels and increased risk of storms and floods will result in increased erosion of the Swan River foreshore and adjacent infrastructure.
  • Accessibility and community use – access is currently unmanaged in the area, the concept plan aims to formalise access for river foreshore users and adjacent residents.
  • Environmental Conservation – this project aims to reinstate and re-connect native fringing foreshore vegetation, expanding green areas and native habitat.
  • Protection of infrastructure – this project will reduce erosion and protect adjacent residential properties and infrastructure.

How can you get involved, find out more or provide feedback

  • View the draft concept design in the document library.
  • View the frequently asked questions (FAQ) in the document library.
  • Provide comments on the draft concept design plan by 5pm, Wednesday, 02 March 2022.
  • Should you have any queries, please contact a member of the Project Team (details on right-hand side of page under Who's Listening).
  • You are required to be a registered user of Your Voice in order to submit your comments. If you have not already done so, please register via the "Register to get Involved tab" on the right-hand side of this page. Registering will also enable the City to keep you updated on this and other City projects.

Further Updates will be posted to this page via the Updates below.

Please provide your comments on the draft concept design plan. Due to some technical difficulties with the YourVoice platform we have now extended the deadline for comments to 5pm, Wednesday, 02 March 2022.